What Makes This Model Suitable for Your Operation
SD20 sits in the 2 metric tons-per-day class for a small commercial site. Sharing one slurry-ice unit and distributing the ice through two planned outlets. That matters because the size of the ice machine should follow real consumption, not the largest number on a catalogue page. Use the hottest-month demand, the busiest work shift, any confirmed resale orders and an appropriate storage reserve to select the plant. Compare the cost of unused capacity with the disruption of repeatedly buying ice when the operation is already at its limit. The next smaller SD10 is rated at 1 metric ton per day. It deserves attention when verified peak use stays comfortably below the 2 metric tons class and the smaller installation leaves enough reserve. The next larger SD30 is rated at 3 metric tons per day. Compare it when peak demand, future lines or delivery commitments would run the SD20 close to its nominal daily rating.
Performance and Design Advantages
Ice Designed for the Actual Application
Fine ice crystals dispersed in a cold liquid can move through pipework and surround delicate seafood surfaces. The fluid medium and concentration need to suit the intended product and pumping arrangement. In the SD20 application, the key is to specify a finished ice form that moves cleanly from the equipment to the customer or production step. The supplied sheet identifies the ice as Pumpable ice slurry, minus 1.5 C. An ice maker with the correct daily capacity is still the wrong purchase if the product is difficult to dispense, transfer or use in the buyer's process.
Equipment Options and Process Integration
The SD20 can be quoted with a compressor option selected from Bitzer, RefComp, Hanbell and Frascold. The model data lists an MCGS PLC-based control platform, 316L ice-contact material and 304 stainless steel for other listed components. Pipe diameter, fluid compatibility, pump selection and storage-tank arrangement are designed around the site and vessel requirements. For a complete project, plan a liquid preparation and treatment system, insulated slurry holding tank where needed, pumps, hygienic distribution lines and application outlets. The itemized quote should separate the base machine from selected accessories, so the buyer knows which components arrive together.
Operation and Reliability
SD20 should fit into the day-to-day work of a small commercial site, not add an unnecessary handling job. Monitor the holding tank, pipework and outlet condition so the mixture continues to circulate and reaches the intended fish hold or processing point. Agree on a cleaning schedule, operator access, drain points, water quality and spare-parts scope before installation. For this capacity, the practical checks are production stability, the clear discharge path and how quickly the operator can identify an alarm or isolate the unit for routine service.
How the Ice Production Process Works
A chilled liquid passes through the slurry-ice production circuit and forms fine ice crystals. The resulting pumpable mixture is delivered to a holding tank or directly through distribution pipework to the application. Ice fraction, liquid composition, operating temperature and pumping distance are important project variables; the source material references a nominal slurry temperature around -1.5 C.
| Item | Specification / Selection Basis |
| Model | SD20 |
| Nominal ice output | 2,000 kg in 24 hours (2 metric tons per day) |
| Hourly production equivalent | Approximately 83.3 kg/h from the 24-hour rating; not a separate guaranteed hourly test |
| Ice form | Pumpable ice slurry, minus 1.5 C |
| Slurry temperature reference | Approximately -1.5°C in source material; final setpoint depends on fluid and application |
| Ice-contact material | 316L stainless steel, as stated in the model sheet |
| Other listed stainless parts | 304 stainless steel, as stated in the model sheet |
| Compressor options | Bitzer / RefComp / Hanbell / Frascold; engineering selection at quotation |
| Controls | MCGS PLC-based operation; final HMI features per approved controls list |
| Refrigerant | R404A listed in source sheet; export configuration and destination compliance to be established |
| Power options | 220 V single-phase or 380-415 V three-phase; 50/60 Hz listed as series options; actual suitability depends on model and installation |
| Certification references | CE and ISO 9001 stated in source sheet; request applicable project documents |
| Dimensions / total installed power / weight | Provided in the project-specific technical drawing and quotation |
| Output verification | Performance to be defined for actual ambient and inlet-water or process-fluid conditions |
Technical note: Installed dimensions, power consumption and final equipment options are established by the approved project drawing and quotation.
Primary use
Primary use — Onboard fishing-vessel cooling. Pump cold slurry to the fish hold rather than moving hard ice by hand. Confirm vessel motion, allowable liquid medium, hose access and hold volume. For SD20, sharing one slurry-ice unit and distributing the ice through two planned outlets. Calculate the daily requirement and the busiest withdrawal period before deciding how much ice should be held in reserve.
Additional commercial use
Additional commercial use — Seafood receiving and pre-cooling. Surround landed seafood with a distributed cold mixture close to the receiving station. Coordinate pump delivery with unloading speed and product temperature targets. At 2 metric tons per day, plan whether the second application uses spare production capacity or needs a separate delivery window.
Other suitable processes
Other suitable processes — Fish-processing lines and cold distribution and multi-point supply. Feed slurry directly or through a holding tank to one or more process points. Use a planned pipe network to supply separate users from centralized production. For each use, document the ice form, hygiene requirements and the route from ice discharge to the actual point of use.
Operation Planning for This Model
A practical operating plan starts with when ice is needed, not when the machine is available to run. For SD20, map the first withdrawal, the most demanding part of the shift and the last planned dispatch. Then check whether one or two designated ice-use points, with enough storage for the busy period will protect production from short-term demand spikes. Where ice is used at several points, assign a person to the bin, tank or loading schedule rather than assuming nominal daily production equals instant delivery. Review water condition and equipment cleanliness as part of the regular shift handover.
Commercial and Technical Procurement Considerations
Before purchasing SD20, compare the full cost of delivered ice with on-site manufacture: bought-ice cost, delay risk, staff handling, water and electricity, cleaning, maintenance and storage. Do not assume the machine replaces every cold-chain cost or that the payback period will be the same at different sites. The business case is strongest when the plant can match daily peak use and short delivery routes and avoid repeated supply interruptions. Ask for a quotation that identifies the installation scope, spare parts, warranty conditions and the operating assumptions behind the selected package.
Installation and Production Line Integration
Install the SD20 where operators can reach the electrical isolation point, water or process-fluid supply, cleaning area and ice-discharge route safely. A small commercial site normally needs one or two designated ice-use points, with enough storage for the busy period. The supporting system may include a liquid preparation and treatment system, insulated slurry holding tank where needed, pumps, hygienic distribution lines and application outlets. Before approving the layout, check drain capacity, access for service, incoming water or liquid quality, ambient design temperature and the length of each conveying or piping run. For multi-line plants, a drawing showing every receiving station and working shift is more useful than positioning the machine by the available floor area alone.
How to Choose Between Neighboring Models
SD20 is rated at 2 metric tons per day. The next smaller SD10 is rated at 1 metric ton per day. It deserves attention when verified peak use stays comfortably below the 2 metric tons class and the smaller installation leaves enough reserve. The next larger SD30 is rated at 3 metric tons per day. Compare it when peak demand, future lines or delivery commitments would run the SD20 close to its nominal daily rating. Use a daily demand curve for the busiest season, the longest shift and any planned additional customers to decide. A smaller machine may cost less to buy yet leave too little reserve; a larger one may add handling and utility costs before the business can use the capacity. The final choice should compare the entire installed ice system, not the ice-machine list price.
Manufacturer Capabilities and Quality Assurance
DAXTRO presents its refrigeration manufacturing work as part of an integrated ice-making, storage and handling offering. The product source materials refer to a 30,000 m² facility in Zhongshan, 316L ice-contact construction, CE/ISO 9001 references and MCGS PLC control. For SD20, ask the supplier to provide the approved general-arrangement drawing, equipment schedule, application-specific material documentation, commissioning scope and maintenance instructions. The purchasing team should also request the model-specific inspection documents and an agreed plan for operator training and spare parts rather than assuming all equipment families have identical paperwork.
Information Needed for an Accurate Quotation
To quote SD20, send DAXTRO the application and expected 2 metric tons-per-day ice need; actual consumption in the busiest shift; peak-season delivery pattern; city and country; summer ambient conditions; incoming water or process-liquid data; and available electrical supply. Also specify a liquid preparation and treatment system, insulated slurry holding tank where needed, pumps, hygienic distribution lines and application outlets, required finished-ice characteristics, storage reserve and the location of the point of use. With those details, the project team can prepare a selected compressor/refrigeration package, utility schedule, layout drawing and an itemized quotation including optional equipment.
What does the 2 ton/day rating mean for SD20?
It is a nominal 24-hour output of 2,000 kg, equivalent to an arithmetic average of 83.3 kg/h. It does not mean that exact production is guaranteed every hour or in every climate. Confirm the test conditions and site-temperature performance in the technical offer.
Who is the SD20 most suitable for?
It is designed as a production class for two ice-use points at one site. In the supplied product positioning, the main use is sharing one slurry-ice unit and distributing the ice through two planned outlets. Verify the busiest operating period and ice-handling route before deciding whether this capacity matches your demand.
What finished slurry ice specification should I request?
The product is specified as pumpable slurry, not by cube or block dimensions. Agree on the liquid medium, target ice concentration and pumping duty.
Which equipment and site details must be confirmed before ordering SD20?
Confirm the final supply voltage and phase, refrigeration package, installed electrical load, footprint, water or process-liquid specification, ice storage, discharge connections and application-specific compliance documents. The series options in the model sheet are not a substitute for an approved project drawing.
When should I choose a different capacity instead of SD20?
The next smaller SD10 is rated at 1 metric ton per day. It deserves attention when verified peak use stays comfortably below the 2 metric tons class and the smaller installation leaves enough reserve. The next larger SD30 is rated at 3 metric tons per day. Compare it when peak demand, future lines or delivery commitments would run the SD20 close to its nominal daily rating. Judge the choice using the highest-demand month and the busiest shift, not the average daily requirement over a year.
What supporting equipment is normally needed?
The full system may need a liquid preparation and treatment system, insulated slurry holding tank where needed, pumps, hygienic distribution lines and application outlets. The exact scope depends on whether ice is used beside the machine, transferred to another production line or dispatched as a commercial product. Ask for the auxiliaries on the same equipment list as the main ice machine.
Request a Technical Proposal
Planning a 2 metric tons-per-day slurry ice project? Send us your site location, busiest daily ice requirement, available power supply and intended ice-handling process. DAXTRO can review the SD20 equipment choice and prepare a project proposal covering the machine, required auxiliaries, layout and commissioning scope. Request a quotation for the 2 Ton Slurry Ice Machine today.






