Home / Products / Ice Machine / Slurry Ice Machine / 0.3 Ton Slurry Ice Machine
  • 0.3 Ton Slurry Ice Machine

0.3 Ton Slurry Ice Machine

The DAXTRO SD03 is a 0.3 metric tons-per-day slurry ice system for one seafood counter needing top-up cooling. Its nominal 24-hour output is 300 kg, or about 12.5 kg/h as an arithmetic average, giving a practical starting point for matching production to a real operating schedule. The intended job is pumping fresh slurry into the display rather than removing the products for re-icing. The supplied model sheet specifies 316L stainless steel at ice-contact surfaces, 304 stainless components elsewhere, and compressor choices from Bitzer, RefComp, Hanbell or Frascold. DAXTRO can configure the refrigeration and downstream handling package around the installation site rather than treating every facility as identical.

Share
  • Features
  • Parameters
  • Typical B2B Applications
  • Frequently Asked Questions

What Makes This Model Suitable for Your Operation

SD03 sits in the 0.3 metric tons-per-day class for a compact site. Pumping fresh slurry into the display rather than removing the products for re-icing. That matters because the size of the ice machine should follow real consumption, not the largest number on a catalogue page. Use the hottest-month demand, the busiest work shift, any confirmed resale orders and an appropriate storage reserve to select the plant. Compare the cost of unused capacity with the disruption of repeatedly buying ice when the operation is already at its limit. The next larger SD10 is rated at 1 metric ton per day. Compare it when peak demand, future lines or delivery commitments would run the SD03 close to its nominal daily rating.


Performance and Design Advantages


Ice Designed for the Actual Application

Fine ice crystals dispersed in a cold liquid can move through pipework and surround delicate seafood surfaces. The fluid medium and concentration need to suit the intended product and pumping arrangement. In the SD03 application, the key is to specify a finished ice form that moves cleanly from the equipment to the customer or production step. The supplied sheet identifies the ice as Pumpable ice slurry, minus 1.5 C. An ice maker with the correct daily capacity is still the wrong purchase if the product is difficult to dispense, transfer or use in the buyer's process.


Equipment Options and Process Integration

The SD03 can be quoted with a compressor option selected from Bitzer, RefComp, Hanbell and Frascold. The model data lists an MCGS PLC-based control platform, 316L ice-contact material and 304 stainless steel for other listed components. Pipe diameter, fluid compatibility, pump selection and storage-tank arrangement are designed around the site and vessel requirements. For a complete project, plan a liquid preparation and treatment system, insulated slurry holding tank where needed, pumps, hygienic distribution lines and application outlets. The itemized quote should separate the base machine from selected accessories, so the buyer knows which components arrive together.


Operation and Reliability

SD03 should fit into the day-to-day work of a compact site, not add an unnecessary handling job. Monitor the holding tank, pipework and outlet condition so the mixture continues to circulate and reaches the intended fish hold or processing point. Agree on a cleaning schedule, operator access, drain points, water quality and spare-parts scope before installation. For this capacity, the practical checks are production stability, the clear discharge path and how quickly the operator can identify an alarm or isolate the unit for routine service.


How the Ice Production Process Works

A chilled liquid passes through the slurry-ice production circuit and forms fine ice crystals. The resulting pumpable mixture is delivered to a holding tank or directly through distribution pipework to the application. Ice fraction, liquid composition, operating temperature and pumping distance are important project variables; the source material references a nominal slurry temperature around -1.5 C.


ItemSpecification / Selection Basis
ModelSD03
Nominal ice output300 kg in 24 hours (0.3 metric tons per day)
Hourly production equivalentApproximately 12.5 kg/h from the 24-hour rating; not a separate guaranteed hourly test
Ice formPumpable ice slurry, minus 1.5 C
Slurry temperature referenceApproximately -1.5°C in source material; final setpoint depends on fluid and application
Ice-contact material316L stainless steel, as stated in the model sheet
Other listed stainless parts304 stainless steel, as stated in the model sheet
Compressor optionsBitzer / RefComp / Hanbell / Frascold; engineering selection at quotation
ControlsMCGS PLC-based operation; final HMI features per approved controls list
RefrigerantR404A listed in source sheet; export configuration and destination compliance to be established
Power options220 V single-phase or 380-415 V three-phase; 50/60 Hz listed as series options; actual suitability depends on model and installation
Certification referencesCE and ISO 9001 stated in source sheet; request applicable project documents
Dimensions / total installed power / weightProvided in the project-specific technical drawing and quotation
Output verificationPerformance to be defined for actual ambient and inlet-water or process-fluid conditions


Technical note: Installed dimensions, power consumption and final equipment options are established by the approved project drawing and quotation.

Primary use

Primary use — Onboard fishing-vessel cooling. Pump cold slurry to the fish hold rather than moving hard ice by hand. Confirm vessel motion, allowable liquid medium, hose access and hold volume. For SD03, pumping fresh slurry into the display rather than removing the products for re-icing. Calculate the daily requirement and the busiest withdrawal period before deciding how much ice should be held in reserve.


Additional commercial use

Additional commercial use — Seafood receiving and pre-cooling. Surround landed seafood with a distributed cold mixture close to the receiving station. Coordinate pump delivery with unloading speed and product temperature targets. At 0.3 metric tons per day, plan whether the second application uses spare production capacity or needs a separate delivery window.


Other suitable processes

Other suitable processes — Fish-processing lines and cold distribution and multi-point supply. Feed slurry directly or through a holding tank to one or more process points. Use a planned pipe network to supply separate users from centralized production. For each use, document the ice form, hygiene requirements and the route from ice discharge to the actual point of use.


Operation Planning for This Model

A practical operating plan starts with when ice is needed, not when the machine is available to run. For SD03, map the first withdrawal, the most demanding part of the shift and the last planned dispatch. Then check whether a simple near-machine bin and short distribution path will protect production from short-term demand spikes. Where ice is used at several points, assign a person to the bin, tank or loading schedule rather than assuming nominal daily production equals instant delivery. Review water condition and equipment cleanliness as part of the regular shift handover.


Commercial and Technical Procurement Considerations

Before purchasing SD03, compare the full cost of delivered ice with on-site manufacture: bought-ice cost, delay risk, staff handling, water and electricity, cleaning, maintenance and storage. Do not assume the machine replaces every cold-chain cost or that the payback period will be the same at different sites. The business case is strongest when the plant can match site-based ice use rather than a full production line and avoid repeated supply interruptions. Ask for a quotation that identifies the installation scope, spare parts, warranty conditions and the operating assumptions behind the selected package.


Installation and Production Line Integration

Install the SD03 where operators can reach the electrical isolation point, water or process-fluid supply, cleaning area and ice-discharge route safely. A compact site normally needs a simple near-machine bin and short distribution path. The supporting system may include a liquid preparation and treatment system, insulated slurry holding tank where needed, pumps, hygienic distribution lines and application outlets. Before approving the layout, check drain capacity, access for service, incoming water or liquid quality, ambient design temperature and the length of each conveying or piping run. For multi-line plants, a drawing showing every receiving station and working shift is more useful than positioning the machine by the available floor area alone.


How to Choose Between Neighboring Models

SD03 is rated at 0.3 metric tons per day. The next larger SD10 is rated at 1 metric ton per day. Compare it when peak demand, future lines or delivery commitments would run the SD03 close to its nominal daily rating. Use a daily demand curve for the busiest season, the longest shift and any planned additional customers to decide. A smaller machine may cost less to buy yet leave too little reserve; a larger one may add handling and utility costs before the business can use the capacity. The final choice should compare the entire installed ice system, not the ice-machine list price.


Manufacturer Capabilities and Quality Assurance

DAXTRO presents its refrigeration manufacturing work as part of an integrated ice-making, storage and handling offering. The product source materials refer to a 30,000 m² facility in Zhongshan, 316L ice-contact construction, CE/ISO 9001 references and MCGS PLC control. For SD03, ask the supplier to provide the approved general-arrangement drawing, equipment schedule, application-specific material documentation, commissioning scope and maintenance instructions. The purchasing team should also request the model-specific inspection documents and an agreed plan for operator training and spare parts rather than assuming all equipment families have identical paperwork.


Information Needed for an Accurate Quotation

To quote SD03, send DAXTRO the application and expected 0.3 metric tons-per-day ice need; actual consumption in the busiest shift; peak-season delivery pattern; city and country; summer ambient conditions; incoming water or process-liquid data; and available electrical supply. Also specify a liquid preparation and treatment system, insulated slurry holding tank where needed, pumps, hygienic distribution lines and application outlets, required finished-ice characteristics, storage reserve and the location of the point of use. With those details, the project team can prepare a selected compressor/refrigeration package, utility schedule, layout drawing and an itemized quotation including optional equipment.


What does the 0.3 ton/day rating mean for SD03?

It is a nominal 24-hour output of 300 kg, equivalent to an arithmetic average of 12.5 kg/h. It does not mean that exact production is guaranteed every hour or in every climate. Confirm the test conditions and site-temperature performance in the technical offer.


Who is the SD03 most suitable for?

It is designed as a production class for one seafood counter needing top-up cooling. In the supplied product positioning, the main use is pumping fresh slurry into the display rather than removing the products for re-icing. Verify the busiest operating period and ice-handling route before deciding whether this capacity matches your demand.


What finished slurry ice specification should I request?

The product is specified as pumpable slurry, not by cube or block dimensions. Agree on the liquid medium, target ice concentration and pumping duty.


Which equipment and site details must be confirmed before ordering SD03?

Confirm the final supply voltage and phase, refrigeration package, installed electrical load, footprint, water or process-liquid specification, ice storage, discharge connections and application-specific compliance documents. The series options in the model sheet are not a substitute for an approved project drawing.


When should I choose a different capacity instead of SD03?

The next larger SD10 is rated at 1 metric ton per day. Compare it when peak demand, future lines or delivery commitments would run the SD03 close to its nominal daily rating. Judge the choice using the highest-demand month and the busiest shift, not the average daily requirement over a year.


What supporting equipment is normally needed?

The full system may need a liquid preparation and treatment system, insulated slurry holding tank where needed, pumps, hygienic distribution lines and application outlets. The exact scope depends on whether ice is used beside the machine, transferred to another production line or dispatched as a commercial product. Ask for the auxiliaries on the same equipment list as the main ice machine.


Request a Technical Proposal

Planning a 0.3 metric tons-per-day slurry ice project? Send us your site location, busiest daily ice requirement, available power supply and intended ice-handling process. DAXTRO can review the SD03 equipment choice and prepare a project proposal covering the machine, required auxiliaries, layout and commissioning scope. Request a quotation for the 0.3 Ton Slurry Ice Machine today.


Contact
Follow Us

Sitemap